Control Tower
Shipments due at an Indian port, supplier payments still to leave, and how volume, materials, on-time arrival, cost and payments have been tracking.
Arriving soon · 25 Aug 2026 – 09 Sep 2026
| Shipment | Material | Journey | Stage | ETA |
|---|---|---|---|---|
| IMP-2026-0428 | Coking Coal | At Sea | 26 Aug 2026 | |
| IMP-2026-0443 | Met Coke | At Sea | 27 Aug 2026 | |
| IMP-2026-0422 | Chrome Ore | Loaded at Origin | 04 Sep 2026 | |
| IMP-2026-0420 | Met Coke | Vessel Assigned | 05 Sep 2026 | |
| IMP-2026-0421 | Coking Coal | Vessel Assigned | 06 Sep 2026 | |
| IMP-2026-0424 | Coking Coal | At Sea | 08 Sep 2026 | |
| IMP-2026-0426 | Manganese Ore | Loaded at Origin | 09 Sep 2026 |
Upcoming payments
Bowen Basin Carbon Pty Ltd is the largest share, at ₹69.2 L of cash due in this window.
Monthly import volume
Met Coke is the largest volume in the latest month, at 3,24,722 tonnes.
Supplier share
Jiangsu Hengrui Resources Co. Ltd supplied the most in this window, with 67% of arrivals on time.
Material mix
Met Coke is 30% of imported tonnage in this window.
On-time arrival trend
In the latest month, 50% of shipments arrived on or before the planned Indian-port date.
Delivered cost per tonne
Each line is actual delivered cost per tonne for that material, averaged across shipments received in the month.
Port split
Haldia handled more tonnage than Paradip. Average days at port: Haldia 15.8, Paradip 11.8.
Payments made
Jiangsu Hengrui Resources Co. Ltd is the largest share of payments made, at ₹127.36 Cr.