IMP-2026-0444
Coking Coal · 61,104.470 MT
Bowen Basin Carbon Pty Ltd · Gladstone → Paradip → Sambalpur · MV Salt Crown
At Sea
20 days to Indian port
On the voyage to India.
Next: At Indian Port · Paradip
What this cargo is
Coking Coal · Carbon · Bowen Basin Carbon Pty Ltd → Sambalpur
Feed for coke ovens and steelmaking at the destination plant.
- Delivery terms
- CFR
- Price basis
- Dry
- Intended plant
- Sambalpur
Ordered → shipped → unloaded → received at plant
Shortfall 61,104.470 MT · ₹18.9 L
Show measurement detail
| Leg | From | To | Variance |
|---|---|---|---|
| Ordered → shipped | 61,104.300 MT | 61,104.470 MT | 0.170 MT |
Wet outturn 61,104.470 MT · dry outturn 61,104.470 MT on the contract dry basis.
Largest movement on Ordered → shipped: 0.170 MT
Measurement certificates
| Measurement | Quantity | Date | Certificate |
|---|---|---|---|
| Contract | 61,104.300 MT | 11 Jul 2026 | CTR-SM-2026-0444 |
| Bill of Lading | 61,104.470 MT | 23 Aug 2026 | BL/0444/2026 |
Unloading
No unloading stages recorded yet.
Quality for steelmaking
| Parameter | Contract | Origin | Indian port | Result |
|---|---|---|---|---|
Ash Lower ash leaves more carbon for the furnace. | 50.00% | 48.04% | 48.04% | Pass |
Moisture Moisture is deducted when the contract prices on a dry basis. | 50.00% | 49.24% | 49.24% | Pass |
Volatile Matter Volatile matter in coking coal affects coke yield. | 50.00% | 50.44% | 50.44% | Pass |
Contract typical against origin and Indian-port Quality test. Moisture on the pricing test is 49.24%.