IMP-2026-0424
Coking Coal · 62,010.470 MT
Bowen Basin Carbon Pty Ltd · Hay Point → Paradip → Sambalpur · MV Southern Cross
At Sea
13 days to Indian port
On the voyage to India.
Next: At Indian Port · Paradip
What this cargo is
Coking Coal · Carbon · Bowen Basin Carbon Pty Ltd → Sambalpur
Feed for coke ovens and steelmaking at the destination plant.
- Delivery terms
- CFR
- Price basis
- Dry
- Intended plant
- Sambalpur
Ordered → shipped → unloaded → received at plant
Shortfall 62,010.470 MT · ₹19.2 L
Show measurement detail
| Leg | From | To | Variance |
|---|---|---|---|
| Ordered → shipped | 62,010.300 MT | 62,010.470 MT | 0.170 MT |
Wet outturn 62,010.470 MT · dry outturn 62,010.470 MT on the contract dry basis.
Largest movement on Ordered → shipped: 0.170 MT
Measurement certificates
| Measurement | Quantity | Date | Certificate |
|---|---|---|---|
| Contract | 62,010.300 MT | 04 Jul 2026 | CTR-SM-2026-0424 |
| Bill of Lading | 62,010.470 MT | 16 Aug 2026 | BL/0424/2026 |
Unloading
No unloading stages recorded yet.
Quality for steelmaking
| Parameter | Contract | Origin | Indian port | Result |
|---|---|---|---|---|
Ash Lower ash leaves more carbon for the furnace. | 50.00% | 48.24% | 48.24% | Pass |
Moisture Moisture is deducted when the contract prices on a dry basis. | 50.00% | 49.44% | 49.44% | Pass |
Volatile Matter Volatile matter in coking coal affects coke yield. | 50.00% | 50.64% | 50.64% | Pass |
Contract typical against origin and Indian-port Quality test. Moisture on the pricing test is 49.44%.