ShyamMetalics
powered by WhizCloud
Demo date · 25 Aug 2026
Tour

IMP-2026-0430

Met Coke · 132,129.990 MT

Jiangsu Hengrui Resources Co. Ltd · Jingtang → Haldia → Jamuria · MV Cape Resolve

Order Confirmed · 20 Jul 2026Order Confirmed20 Jul 2026Vessel Assigned · 21 Jul 2026Vessel Assigned21 Jul 2026Loaded at Origin · 01 Aug 2026Loaded at Origin01 Aug 2026+1dAt Sea · 05 Aug 2026At Sea05 Aug 2026+1dAt Indian Port · 19 Aug 2026At Indian Port19 Aug 2026+1dCustoms Cleared · planned 27 Aug 2026Customs Cleared27 Aug 2026Road to Plant · planned 30 Aug 2026Road to Plant30 Aug 2026Received at Plant · planned 11 Sep 2026Received at Plant11 Sep 2026

At Indian Port

1 day past plan

Arrived, unloading — includes barge transfer where the port is shallow — behind plan

Next: Customs Cleared

Unloaded against shipped

132,128.940 MT / 132,129.990 MT

Survey gap 1.050 MT — cargo still in the pipeline, not a plant shortfall.

Haldia needs barge transfer.

What this cargo is

Met Coke · Carbon · Jiangsu Hengrui Resources Co. Ltd → Jamuria

Blast-furnace coke — ash, fixed carbon and CSR decide furnace performance.

Delivery terms
CIF
Price basis
Dry
Intended plant
Jamuria

Ordered → shipped → unloaded → received at plant

Ordered
132,130.100 MT100.00%
Shipped
132,129.990 MT100.00%
Unloaded at Indian port
132,128.940 MT100.00%
Received at plant
0.000 MT0.00%

Shortfall 132,129.990 MT · ₹41.0 L

Show measurement detail
LegFromToVariance
Ordered → shipped132,130.100 MT132,129.990 MT0.110 MT
BILL_OF_LADING → DISCHARGE_WEIGHT_SURVEY132,129.990 MT132,128.940 MT1.050 MT

Wet outturn 132,128.940 MT · dry outturn 125,258.235 MT on the contract dry basis.

Largest movement on BILL_OF_LADING → DISCHARGE_WEIGHT_SURVEY: 1.050 MT · Shipping line

Measurement certificates

MeasurementQuantityDateCertificate
Contract132,130.100 MT12 Jun 2026CTR-SM-2026-0430
Bill of Lading132,129.990 MT01 Aug 2026BL/0430/2026
Indian-port weight survey132,128.940 MT19 Aug 2026WS/0430

Unloading

This cargo needs barge transfer at a shallow Indian port before the road run to Jamuria.

StageVesselQuantityStartedCompleted
Main vessel at anchorageMV Cape Resolve132,129.990 MT19 Aug 2026—
Barge transferBG Ganga Star 115,855.599 MT19 Aug 2026—
Barge transferBG Ganga Star 215,855.599 MT19 Aug 2026—
Barge transferBG Hooghly Pride17,176.899 MT19 Aug 2026—
Barge transferBG Hooghly Valour15,855.599 MT19 Aug 2026—
Main vessel at berthMV Cape Resolve67,386.295 MT——

Quality for steelmaking

ParameterContractOriginIndian portResult
Ash

Lower ash leaves more carbon for the furnace.

50.00%48.30%48.30%Pass
Moisture

Moisture is deducted when the contract prices on a dry basis.

50.00%49.50%49.50%Pass
Fixed Carbon

Fixed carbon available for reduction in the furnace.

50.00%50.70%50.70%Pass
Coke Strength after Reaction

Coke strength after reaction — higher CSR holds the blast-furnace burden.

50.0051.9051.90Pass

Contract typical against origin and Indian-port Quality test. Moisture on the pricing test is 49.50%.