IMP-2026-0500
Met Coke · 63,140.470 MT
Bowen Basin Carbon Pty Ltd · Hay Point → Haldia → Jamuria · MV Ocean Sentinel
Quantity received against shipped
63,137.720 MT / 63,140.470 MT
Shortfall 2.750 MT · ₹84
Each leg's loss is valued at the cost accrued to that point.
Delivered cost per tonne
₹32.00
Budget ₹33.00 · −₹1.00
What this cargo is
Met Coke · Carbon · Bowen Basin Carbon Pty Ltd → Jamuria
Blast-furnace coke — ash, fixed carbon and CSR decide furnace performance.
- Delivery terms
- CIF
- Price basis
- Dry
- Intended plant
- Jamuria
Ordered → shipped → unloaded → received at plant
Shortfall 2.750 MT · ₹84.10
Show measurement detail
| Leg | From | To | Variance |
|---|---|---|---|
| Ordered → shipped | 63,140.300 MT | 63,140.470 MT | 0.170 MT |
| BILL_OF_LADING → DISCHARGE_WEIGHT_SURVEY | 63,140.470 MT | 63,139.320 MT | 1.150 MT |
| DISCHARGE_WEIGHT_SURVEY → WEIGHBRIDGE_NET | 63,139.320 MT | 63,137.720 MT | 1.600 MT |
| Plant receipt posting | 63,137.720 MT | 63,137.720 MT | 0.000 MT |
Wet outturn 63,139.320 MT · dry outturn 59,856.075 MT on the contract dry basis.
Largest movement on DISCHARGE_WEIGHT_SURVEY → WEIGHBRIDGE_NET: 1.600 MT · Transporter
Measurement certificates
| Measurement | Quantity | Date | Certificate |
|---|---|---|---|
| Contract | 63,140.300 MT | 25 May 2025 | CTR-SM-2026-0500 |
| Bill of Lading | 63,140.470 MT | 04 Jul 2025 | BL/0500/2026 |
| Indian-port weight survey | 63,139.320 MT | 27 Jul 2025 | WS/0500 |
| Weighbridge net | 63,137.720 MT | 28 Aug 2025 | WB/0500 |
| Plant receipt | 63,137.720 MT | 28 Aug 2025 | GRN/0500 |
Unloading
This cargo needs barge transfer at a shallow Indian port before the road run to Jamuria.
| Stage | Vessel | Quantity | Started | Completed |
|---|---|---|---|---|
| Main vessel at anchorage | MV Ocean Sentinel | 63,140.470 MT | 27 Jul 2025 | 27 Jul 2025 |
| Barge transfer | BG Ganga Star 1 | 7,576.856 MT | 27 Jul 2025 | 28 Jul 2025 |
| Barge transfer | BG Ganga Star 2 | 7,576.856 MT | 27 Jul 2025 | 29 Jul 2025 |
| Barge transfer | BG Hooghly Pride | 8,208.261 MT | 27 Jul 2025 | 30 Jul 2025 |
| Barge transfer | BG Hooghly Valour | 7,576.856 MT | 27 Jul 2025 | 31 Jul 2025 |
| Main vessel at berth | MV Ocean Sentinel | 32,201.640 MT | 01 Aug 2025 | 27 Jul 2025 |
Quality for steelmaking
| Parameter | Contract | Origin | Indian port | Result |
|---|---|---|---|---|
Ash Lower ash leaves more carbon for the furnace. | 50.00% | 48.20% | 48.20% | Pass |
Moisture Moisture is deducted when the contract prices on a dry basis. | 50.00% | 49.40% | 49.40% | Pass |
Fixed Carbon Fixed carbon available for reduction in the furnace. | 50.00% | 50.60% | 50.60% | Pass |
Coke Strength after Reaction Coke strength after reaction — higher CSR holds the blast-furnace burden. | 50.00 | 51.80 | 51.80 | Pass |
Contract typical against origin and Indian-port Quality test. Moisture on the pricing test is 49.40%.