ANCHORLINE
Demo date · 20 Aug 2026
What am I looking at?

The contract specifies what the material should assay at — ash, moisture, fixed carbon and so on. The cargo is sampled at the load port and again at discharge. Where the delivered analysis is worse than the specification, the contract reprices it, and this screen shows that arithmetic step by step. If a parameter is beyond the rejection limit, we have the contractual right to refuse the cargo.

Contract against delivered
Each parameter as promised and as it actually landed. Figures are shown as percentages; internally they are held in basis points so nothing rounds away.
Adjustment working
Penalty per tonne for each step beyond the threshold, multiplied by the priced quantity. This is what we deduct from the final invoice.
Rejection limit
The point past which the cargo may be refused outright rather than merely repriced.

Read the full guide for this screen · written for Commercial

PCL-2026-0521

Chrome Ore · 35,250.000 MT · CFR Haldia · MV Pacific Noble (IMO 9762003) · B/L BL/0521 dated 10 Jun 2026

Assay comparison

Load-port assay pending · Discharge-port SGS India Pvt Ltd · LAB/0521

ParameterContract typicalContract limitLoad-port assayDischarge-port assaypricing basisDeviationPrice impact
Moisture
Chromium Oxide
ASH12.00 %max 12.50 %12.20 %+0.20

Price adjustment

  1. Base price

    $301.00 / MT wet

  2. ASH

    Assay 12.20 % is inside the 12.50 % threshold. No penalty.

  3. Final price

    $301.00 / MT wet

  4. Priced quantity

    35,109.000 MT wet

  5. Goods value

    $10,567,809.00 = $301.00 × 35,109.000 MT