IMP-2026-0510
Met Coke · 43,623.990 MT
Rizhao Carbon Materials Co. Ltd · Rizhao → Haldia → Jamuria · MV Yellow River
Quantity received against shipped
43,621.670 MT / 43,623.990 MT
Shortfall 2.320 MT · ₹71
Each leg's loss is valued at the cost accrued to that point.
Delivered cost per tonne
₹32.00
Budget ₹32.00 · +₹0.00
What this cargo is
Met Coke · Carbon · Rizhao Carbon Materials Co. Ltd → Jamuria
Blast-furnace coke — ash, fixed carbon and CSR decide furnace performance.
- Delivery terms
- CIF
- Price basis
- Dry
- Intended plant
- Jamuria
Ordered → shipped → unloaded → received at plant
Shortfall 2.320 MT · ₹71.12
Show measurement detail
| Leg | From | To | Variance |
|---|---|---|---|
| Ordered → shipped | 43,624.100 MT | 43,623.990 MT | 0.110 MT |
| BILL_OF_LADING → DISCHARGE_WEIGHT_SURVEY | 43,623.990 MT | 43,623.190 MT | 0.800 MT |
| DISCHARGE_WEIGHT_SURVEY → WEIGHBRIDGE_NET | 43,623.190 MT | 43,621.670 MT | 1.520 MT |
| Plant receipt posting | 43,621.670 MT | 43,621.670 MT | 0.000 MT |
Wet outturn 43,623.190 MT · dry outturn 41,354.784 MT on the contract dry basis.
Largest movement on DISCHARGE_WEIGHT_SURVEY → WEIGHBRIDGE_NET: 1.520 MT · Transporter
Measurement certificates
| Measurement | Quantity | Date | Certificate |
|---|---|---|---|
| Contract | 43,624.100 MT | 20 Feb 2026 | CTR-SM-2026-0510 |
| Bill of Lading | 43,623.990 MT | 11 Apr 2026 | BL/0510/2026 |
| Indian-port weight survey | 43,623.190 MT | 30 Apr 2026 | WS/0510 |
| Weighbridge net | 43,621.670 MT | 25 May 2026 | WB/0510 |
| Plant receipt | 43,621.670 MT | 25 May 2026 | GRN/0510 |
Unloading
This cargo needs barge transfer at a shallow Indian port before the road run to Jamuria.
| Stage | Vessel | Quantity | Started | Completed |
|---|---|---|---|---|
| Main vessel at anchorage | MV Yellow River | 43,623.990 MT | 30 Apr 2026 | 30 Apr 2026 |
| Barge transfer | BG Ganga Star 1 | 5,234.879 MT | 30 Apr 2026 | 01 May 2026 |
| Barge transfer | BG Ganga Star 2 | 5,234.879 MT | 30 Apr 2026 | 02 May 2026 |
| Barge transfer | BG Hooghly Pride | 5,671.119 MT | 30 Apr 2026 | 03 May 2026 |
| Barge transfer | BG Hooghly Valour | 5,234.879 MT | 30 Apr 2026 | 04 May 2026 |
| Main vessel at berth | MV Yellow River | 22,248.235 MT | 05 May 2026 | 30 Apr 2026 |
Quality for steelmaking
| Parameter | Contract | Origin | Indian port | Result |
|---|---|---|---|---|
Ash Lower ash leaves more carbon for the furnace. | 50.00% | 48.30% | 48.30% | Pass |
Moisture Moisture is deducted when the contract prices on a dry basis. | 50.00% | 49.50% | 49.50% | Pass |
Fixed Carbon Fixed carbon available for reduction in the furnace. | 50.00% | 50.70% | 50.70% | Pass |
Coke Strength after Reaction Coke strength after reaction — higher CSR holds the blast-furnace burden. | 50.00 | 51.90 | 51.90 | Pass |
Contract typical against origin and Indian-port Quality test. Moisture on the pricing test is 49.50%.