What am I looking at?
The contract specifies what the material should assay at — ash, moisture, fixed carbon and so on. The cargo is sampled at the load port and again at discharge. Where the delivered analysis is worse than the specification, the contract reprices it, and this screen shows that arithmetic step by step. If a parameter is beyond the rejection limit, we have the contractual right to refuse the cargo.
- Contract against delivered
- Each parameter as promised and as it actually landed. Figures are shown as percentages; internally they are held in basis points so nothing rounds away.
- Adjustment working
- Penalty per tonne for each step beyond the threshold, multiplied by the priced quantity. This is what we deduct from the final invoice.
- Rejection limit
- The point past which the cargo may be refused outright rather than merely repriced.
Read the full guide for this screen · written for Commercial
PCL-2026-0417
Low Ash Metallurgical Coke · 45,000.000 MT · CFR Haldia · MV Iron Meridian (IMO 9648233) · B/L HDC/JTG/2026/0417 dated 28 May 2026
Quality deviation cost $209,679.86 on this parcel
$209,679.86 versus unadjusted goods value. Supplier performance, last twelve months
Assay comparison
Load-port CCIC · CCIC/LAB/26/3312 · Discharge-port SGS India Pvt Ltd · LAB/HDC/2026/2291
| Parameter | Contract typical | Contract limit | Load-port assay | Discharge-port assaypricing basis | Deviation | Price impact |
|---|---|---|---|---|---|---|
| Ash | 12.00 % | max 12.50 % | 12.40 % | 13.20 % | +1.20 | -$3.50 / MT |
| Moisture | 4.60 % | max 5.00 % | 4.60 % | 5.40 % | +0.80 | — |
| Fixed Carbon | 86.50 % | min 86.00 % | 86.30 % | 85.10 % | −1.40 | — |
| Coke Strength after Reaction | 65.00 | min 64.00 | 64.20 | 62.80 | −2.20 | -$1.44 / MT |
Price adjustment
- Base price
$342.00 / MT dry
- Ash penalty
Assay 13.20 % vs threshold 12.50 % → excess 0.70 %. Steps = 70 bps / 50 bps (pro rata) = 1.400 × $2.50 = -$3.50 / MT.
- Coke Strength after Reaction penalty
Assay 62.80 vs threshold 64.00 → excess 1.20. Steps = 120 bps / 100 bps (pro rata) = 1.200 × $1.20 = -$1.44 / MT.
- Final price
$337.06 / MT dry
- Priced quantity
42,445.317 MT dry
- Goods value
$14,306,618.55 = $337.06 × 42,445.317 MT